Federal Aviation Administration chose a 48′ x 20′ PowerLift retrofit.
New runway surfaces are put through their paces under the wheels of computerized load trolleys. These apply up to 1.3 million pounds over a 20-tire axle, as well as individual wheel loads of 75,000 pounds.
We designed, built, delivered, and installed this PowerLift as a turnkey project, all built to FAA standards. We removed the old door that failed, then installed the replacement with its new cladding and trim.
Please call, and we’ll provide a proposal for whatever aviation or industrial project you’re considering.
Call us about your retrofit door.